Telephone: 01284 810586

Evaporative Cooling from ecocooling

FORTHCOMING EVENTS:
We regularly attend trade shows and environmental events - any forthcoming events will appear below - we look forward to meeting you there

talk to Ecocoling about environmentally friendly evaporative cooling

 


ECOBUILD EXHIBITION
London, Earls Court
Stand 2103
2nd-4th March 2010

BEST PRACTICE LOW CARBON INNOVATION FORUM

National Motorcycle Museum
10th March 2010

NEMEX 2010
part of Sustainability Live
NEC Birmingham
20-22 April, 2010
Stand N29

Low Carbon Best Practice Exchange
10 June 2010
Olympia Conference Centre, London

THE ENERGY EVENT 2010
National Motorcycle Museum - Stand 54
8th-9th September 2010

ENERGY SOLUTIONS EXPO
London, Olympia
Stand F80
6th-7th October2010

 

Alan Beresford
MANAGING DIRECTOR OF ECOCOOLING
is on the CIBSE steering committee for the design of data centre Cooling

Case Studies - Cooling the Pharmaceutical Warehouse

Evaporative cooling in factories
Evaporative Cooling - air cooling the warehouse
Cooling the Warehouse with Evaporative Cooling

Founded 18 years ago, Chemilines is a parallel importer of pharmaceutical products with the NHS as its major customer.  In March 2008 the company opened a new 90,000 sq ft repackaging and warehouse facility in Wembley.

A key objective was to ensure that the warehouse complied with temperature controlled storage conditions as regulated by the MHRA
evaporative cooling - air cooling the warehouse

 

EcoCooling evaporative cooling was applied as part of a complete warehouse temperature control scheme.  The existing heating system was incorporated into a integrated approach to heating, cooling and de-stratification.  A central controller also provides data capture with remote access and automated alarm communication.

Full monitoring and data logging was provided together with SMS messaging of alarm conditions.

The current principles being applied to meet the MHRA controlled temperature guidelines are;

  • The system shall be designed to maintain the warehouse under 25°C during normal UK weather conditions
  • In exception conditions the 7 day mean kinetic temperature shall not exceed 25°C
There shall be no ‘excursions’ over 30°C

 

Cooling the wearhouse with evaporative cooling